| STD-M01 |
STANDARD 1-1/2" METER SETTING WITH 1-1/2" METER FOR VAULTS (DATED 10-1-97) AND BILL OF MATERIAL (DATED 12-10-98)
(Materials Required for Installation - click here) |
| STD-M02 |
STANDARD 2" METER SETTING WITH 2" METER FOR VAULTS (DATED 10-1-97) AND BILL OF MATERIAL
(DATED 12-10-98)
(Materials Required for Installation - click here) |
| STD-M03 |
APPROVED 2" METER SETTING FOR 2" METER AND BACKFLOW ASSEMBLY FOR VAULTS LAWN IRRIGATION ONLY (DATED 10-1-97) AND BILL OF MATERIAL
(DATED 12-10-98)
(Materials Required for Installation - click here) |
| STD-M04 |
STANDARD 3" METER SETTING WITH 2" METER FOR VAULTS -PLAN- (DATED 10-1-97) AND BILL OF MATERIAL (DATED 11-19-98)
(Materials Required for Installation - click here) |
| STD-M05 |
STANDARD 3" METER SETTING WITH 2" METER FOR VAULTS -ELEVATION- (DATED 10-1-97) AND BILL OF MATERIAL (DATED 11-19-98)
(Materials Required for Installation - click here) |
| STD-M06 |
STANDARD 3" METER SETTING WITH 3" METER FOR VAULTS -PLAN- (DATED 10-1-97) AND BILL OF MATERIAL (DATED 11-19-98)
(Materials Required for Installation - click here) |
| STD-M07 |
STANDARD 3" METER SETTING WITH 3" METER FOR VAULTS -ELEVATION- (DATED 10-1-97) AND BILL OF MATERIAL (DATED 11-19-98)
(Materials Required for Installation - click here) |
| STD-M08 |
STANDARD 4" METER SETTING WITH 4" METER FOR VAULTS (DATED 10-1-97) AND BILL OF MATERIAL
(DATED
11-19-98)
(Materials Required for Installation - click here) |
| STD-M09 |
STANDARD 4" METER SETTING WITH 3" METER FOR VAULTS (DATED 5-18-98) AND BILL OF MATERIAL
(DATED
11-19-98)
(Materials Required for Installation - click here) |
| STD-M10 |
STANDARD 6" METER SETTING WITH 6" METER FOR VAULTS (DATED 4-26-2005) AND BILL OF MATERIAL
(DATED 11-19-98)
(Materials Required for Installation - click here)
|
| STD-M11 |
STANDARD 6" METER SETTING WITH 4" METER FOR VAULTS (DATED 5-18-98) AND BILL OF MATERIAL
(DATED 11-19-98)
(Materials Required for Installation - click here) |
| STD-M12 |
STANDARD 8" METER SETTING WITH 8" METER FOR VAULTS (DATED 10-1-97) AND BILL OF MATERIAL
(DATED
11-19-98)
(Materials Required for Installation - click here) |
| STD-M13 |
STANDARD 8" METER SETTING WITH 6" METER FOR VAULTS (DATED 4-26-2005) AND BILL OF MATERIAL
(DATED 11-19-98)
(Materials Required for Installation - click here) |
| STD-M14 |
STANDARD 12" METER SETTING WITH 12" METER FOR VAULTS (DATED 10-1-97) AND BILL OF MATERIAL
(DATED 11-19-98)
(Materials Required for Installation - click here)
|
| STD-M15 |
TYPICAL 3", 4", 6", AND 8" METER SETTINGS WITH 1", 1-1/2" OR 2" LAWN SPRINKLER CONNECTION
(DATED 10-1-97) |
| STD-M16 |
TYPICAL 1-1/2" & 2" METER SETTINGS WITH 1" & 1-1/2" LAWN SPRINKLER CONNECTION (DATED 10-1-97) |
| STD-M17 |
APPROVED INSIDE BUILDING METER SETTINGS FOR 5/8", 1" METERS. (DATED 10-1-97) |
| STD-M18 |
APPROVED INSIDE BUILDING METER SETTINGS FOR 5/8", 1" METERS FOR SEWER EXEMPTION.
(DATED 5-29-2002) |
| STD-M19 |
APPROVED INSIDE BUILDING METER SETTING FOR 1-1/2" METER AND CHECKVALVE. OBSOLETE
(DATED 11-26-97) |
| STD-M20 |
APPROVED INSIDE BUILDING METER SETTING FOR 1-1/2" METER AND BACKFLOW ASSEMBLY.
(DATED 10-1-97) |
| STD-M21 |
APPROVED INSIDE BUILDING METER SETTING FOR 2" METER AND CHECKVALVE. OBSOLETE (DATED 11-26-97) |
| STD-M22 |
APPROVED INSIDE BUILDING METER SETTING FOR 2" METER AND BACKFLOW ASSEMBLY. (DATED 10-1-97) |
| STD-M23 |
APPROVED 1-1/2" METER SETTING FOR 1-1/2" METER AND BACKFLOW ASSEMBLY FOR VAULTS LAWN IRRIGATION ONLY (DATED 10-23-97) |
| STD-M24 |
APPROVED 1" METER SETTING FOR 1" METER AND BACKFLOW ASSEMBLY FOR VAULTS LAWN IRRIGATION ONLY (DATED 8-21-2000) |
| STD-M25 |
STANDARD 1-1/2" METER SETTING WITH 1-1/2" METER IN VAULT FOR 2" CONNECTION (DATED 1-12-1999) AND BILL OF MATERIAL (DATED 1-12-99)
(Materials Required for Installation - click here) |
| STD-M26 |
STANDARD 1" METER SETTING WITH 1" REGULATOR FOR 2" CONNECTION IN VAULT (DATED 1-12-1999) |
| STD-M27 |
STANDARD 1" METER SETTING WITH 1" REGULATOR FOR 1-1/2" CONNECTION IN VAULT (DATED 1-12-1999) |
| STD-M28 |
STANDARD 1" METER SETTING FOR 2" CONNECTION IN VAULT (DATED 1-12-1999) |
| STD-M29 |
STANDARD 1" METER SETTING FOR 1-1/2" CONNECTION IN VAULT (DATED 1-12-1999) |
| STD-M30 |
STANDARD 1" SERVICE CONNECTION WITH CLEVELAND STANDARD METER PIT WITH REGULATOR DETAIL IN PUBLIC RIGHT OF WAY
(DATED 8-24-2007) |
| STD-M31 |
STANDARD 1" SERVICE CONNECTION WITH CLEVELAND STANDARD METER PIT DETAIL IN PUBLIC RIGHT OF WAY (DATED
10-12-2007) |
| STD-M32 |
STANDARD 1" SERVICE CONNECTION WITH CLEVELAND STANDARD METER PIT FOR IRRIGATION IN PUBLIC RIGHT OF WAY (DATED 5-20-1999) |
| STD-M33 |
3" IRRIGATION METER SETTING WITH 3" METER DATED 11-17-1999 AND BILL OF MATERIAL (DATED 4-19-2000)
(Materials Required for Installation - click here) |
| STD-M34 |
4" IRRIGATION METER SETTING WITH 4" METER DATED 3-13-2000 AND BILL OF MATERIAL (DATED 4-19-2000)
(Materials Required for Installation - click here) |
| STD-M35 |
6" IRRIGATION METER SETTING WITH 6" METER DATED 4-19-2000 AND BILL OF MATERIAL (DATED 4-19-2000)
(Materials Required for Installation - click here) |
| STD-M36 |
LARGE METER SETTINGS INSIDE BUILDINGS
(DATED 9-15-2004) |
| STD-M37 |
FM APPROVED 8" COMPOUND METER ASSEMBLY FOR VAULT DATED 5-25-2001 WITH BILL OF MATERIAL (DATED 5-25-2001)
(Materials Required for Installation - click here) |
| STD-M38 |
FM APPROVED 8" COMPOUND METER ASSEMBLY FOR VAULT SENSUS METER (DATED 6-25-2004) WITH BILL OF MATERIAL (DATED 11-29-2001)
(Materials Required for Installation - click here) |
| STD-M39 |
FM APPROVED 12" COMPOUND METER ASSEMBLY FOR VAULT DATED 9-18-2003 WITH BILL OF MATERIAL (DATED 9-18-2003)
(Materials Required for Installation - click here) |